
What's usually involved
- A suitable outdoor-rated socket with RCD protection
- For sheds, workshops and garden rooms, usually a new circuit from the consumer unit, run in cable that's suitable for burial or protected along its route
- Sometimes a small consumer unit in the outbuilding
- Testing and certification when it's finished
Adding a new circuit, or a new outdoor circuit, is notifiable under Approved Document P. A registered installer can self-certify the work and notify building control for you; otherwise you need building control approval.
Planning a garden room or workshop?
Think about what you'll run in there (heaters, power tools, a kettle) as this affects the size of the supply. If you might add an EV charger later, mention it at the same time.
Don't power an outbuilding with an extension lead through a window or door. Keep electrics away from hoses and ponds, and use an RCD with outdoor tools. See Electrical Safety First's garden safety advice.
- Adding an outdoor socket
- Running power to a shed, workshop or garden room
- Existing garden electrics that trip, look damaged or let water in
Sources and further reading
- GOV.UK – Approved Document P (electrical safety in dwellings)
- GOV.UK – Building regulations approval
- Electrical Safety First – Garden safety
- IET – BS 7671 Wiring Regulations
General guidance only, based on the sources above. Last reviewed October 2026. It isn't a substitute for an inspection by a qualified electrician.